Each release of PHP has a team of release managers responsible for managing the release process. Next month, the other PHP 8.5 release managers and I will begin the process of selecting the release managers for PHP 8.6. I figured it might be helpful to document my experiences so far, to give potential volunteers some extra context.

So far, my experience as a release manager has been dominated by the work that precedes general availability (GA), i.e. getting PHP 8.5 from development to the initial release of PHP 8.5.0. As a result, I focus mostly on the pre-GA work. If you are considering volunteering to be a release manager, I hope you find my write-up useful.

Time commitment

Being a release manager represents a commitment to the PHP community that you have the time to do the needed work. As part of each release, you will need to build two versions of PHP (one with thread-safe support and one without), run an extensive test suite, and, if everything looks good, tag the release and build the tarball.

At least in my setup (I use a Windows machine and do development in a docker container) running the tests generally takes at least an hour. Most of that time is spent on waiting for the build and test commands to finish executing, so I don't necessarily need to be actively doing anything, but packaging a release is not something that can be done in just a few minutes. I'm told that for others the process is significantly faster, so this may be a quirk of my setup - after you go through the process the first time you should have a sense of how long it will take. Of course, if things go wrong, or tests fail and you need to debug them, the packaging process can take longer than usual. I generally set aside three hours for packaging a release. This work is generally done on Tuesdays, and a new release (or release candidate) is built every two weeks.

Packaging is done on Tuesdays, but announcements are delayed until Thursday. The announcement process does not take as long, but the announcement emails need to wait until after the PHP website is updated, and updates to the website are not instantaneous. The current documentation suggests that it can take up to an hour for the website to update - I generally set aside two hours on days that I am announcing a release.

The "every two weeks" cadence applies from the start of the release cycle with the first alpha release, until the end of bugfix support roughly two-and-a-half years later. Afterwards, security releases are done as needed. Security releases also don't use release candidates, so the time commitment is typically lower. (I haven't done this yet, ask me again in two years to confirm.)

Review commitment

After the first beta release for a PHP version is tagged, there is a "soft" freeze on new features being added to PHP. At the point of the beta release being tagged, the new version (e.g. PHP 8.6) is still being built from the master branch of the PHP source code. There is not yet a separate branch for the version after that (e.g. PHP 8.7). Any new changes merged into PHP would be included in the new release, and thus care is required in deciding what changes should be merged.

From the start of the "soft" feature freeze, new features (including those that were accepted in an RFC) can only be merged with the agreement of the release managers for that release. It is unclear whether this means that only one of the release managers needs to approve the changes, or that they all do; the release managers for a specific version can decide that amongst themselves. Either way, release managers are expected to be available to review requests for inclusion in the new version and either accept them for inclusion or defer them until the next version. There were a number of patches that the PHP 8.5 release managers decided not to include after the feature freeze, and were delayed until after PHP 8.5 was branched.

To be clear, release managers are not required to be reviewing the changes from a technical perspective, but should be able to understand the changes well enough to assess risk. Release managers decide if changes would break existing PHP code, create confusion among developers, or lock in an API that is problematic. I would frequently mark patches as approved with the comment along the lines of "RM approval, technical review not performed" to make the distinction clear.

Permissions

Release managers are given commit access to the php/php-src, which is needed for committing changes, creating branches and tags, and other core parts of the release workflow. They are also able to bypass some rules that govern that repository; most people with merge access don't have the ability to create new branches or tags.

I had commit access before becoming a release manager, and so was already used to being extra careful about what repository I was pushing to. For new release managers who may not be used to having direct commit access, it is extra important to make sure that you are only pushing the branches and tags that you mean to, and are pushing to the correct repository. If you accidentally push a commit to the wrong remote, you won't be able to force-push away your mistake; the GitHub rule that blocks force pushing is one of the rules that release managers cannot bypass.

To prevent potential mistakes, I do all of my release manager work in an entirely different local copy of php than I do my development, and to push changes I need to specify the upstream php-src-for-pushing, to avoid accidentally publishing the wrong thing.

Unplanned work

Occasionally, release managers have more work than expected, and need to create an extra release. Before PHP 8.5 was released, I already experienced this twice, first when PHP 8.5.0alpha3 was skipped and I had to build a new release for 8.5.0alpha4 (details), and then later when a fifth release candidate was needed for PHP 8.5.0 (details). In the first case, I only needed to redo the work from Tuesday (building the release), but in the second case I needed to both build and announce an extra release.

While I have not experienced an unplanned release for PHP 8.5 since general availability, in my capacity as a normal PHP developer I was involved in some patches for PHP 8.4 that resulted in a second release candidate for PHP 8.4.7. In other words, unplanned extra releases can be needed even after general availability.

Documentation and resources

Over the years, the release process for PHP has changed, as have the various parts of the php.net infrastructure that are referenced in the documentation. As a result, the documentation can sometimes be unclear or unreliable. I bring this up not to criticize the previous release managers who wrote the documentation, but instead to highlight the fact that new release managers cannot assume the documentation is fully up to date. If something does not seem right, send a pull request to change it! If you are unsure, the release managers for each release generally include a "veteran" who released a previous version of PHP and can be consulted for clarification.

Conclusion

Despite the hours needed to be a release manager, the unplanned work, and the extra worry that comes with using my GitHub access correctly, I've still enjoyed the experience. As a release manager, I get the opportunity to give back to the PHP language that I use every day. For developers who may not be as comfortable contributing to the development of PHP, serving as a release manager is a concrete and meaningful way to contribute.